First fix, to the drawing
Kitchen plumbing is set out against a plan that hasn't been built yet, so it pays to be pedantic: services brought up inside the right carcass, waste at a fall that will still work once the units are levelled, isolation on everything so a future appliance swap doesn't mean draining down. We work to the fitter's programme and get out of their way.


